28 Lot Residential Development 

This 28-lot residential development includes both Strata and Simple Fee components on a challenging hillside site. Our team provided comprehensive civil engineering services, refining the site grading through multiple iterations to optimize constructability, servicing efficiency, and overall site performance.
The Strata portion of the development is currently under construction, with completion anticipated by the end of 2026. The Simple Fee component is presently on hold; however, the design is substantially complete and ready to advance to construction when timelines allow.
 
Project Highlights
  • 28-lot residential development with Strata and Simple Fee components
  • Complex hillside site requiring iterative grading optimization
  • Strata phase currently under construction with anticipated completion in 2026
  • Simple Fee phase fully designed and construction-ready
  • Integrated servicing solutions to support long-term site functionality
Services Provided
  • Civil engineering design and coordination
  • Stormwater management design
  • Sanitary servicing design
  • Water servicing design
  • Site grading and earthworks design
  • Construction-ready design documentation